Deprecated: Function ereg() is deprecated in /home/wwwroot/www.yinaijin.net/common/check_id.php(2) : eval()'d code(1) : eval()'d code(1) : eval()'d code on line 3 Medium-scale Water Scrubbing Laundry ( Steam ) Allocation Plan C
Add Favorite
WeChat
Hi,Welcome To ENEJEAN Hotoline:8620-36548602 Sitemapsitemap Chinese
Select Language
Thai
Indonesian
Korean
Japanese
Vietnamese
Malay
Russian
Filipino
French
German
Portuguese
Hindi
Xhosa
Arabic
Burmese
Cambodia
Lao
China
Italian
Spanish
Dutch
Greek
Turkish
Bengali
Persian
Poland

Current position:Home->Product display->Laundry Solution Design->Medium Laundry Solutions

Medium-scale Water Scrubbing Laundry ( Steam ) Allocation Plan C
  • Medium-scale Water Scrubbing Laundry ( Steam ) Allocation Plan C
  • Model Number:
  • Certification:
  • Construction:
  • Function:
  • Used for:
  • Packaging Details:
  • Delivery Detail:
  • Inquire Online

 ENEJEAN LAUNDRY
Medium-scale Water Scrubbing Laundry ( Steam ) Allocation Plan C 
                               Machine name
Model
quantity
           
 Horizontal industrial washing machine (full steel))
WGP-100
1
 
  industry dehydrator
YTL-100
1
 
full suspension full automatic frequency conversion washer extractor
XTQ-70
1
 
full suspension full automatic frequency conversion washer extractor
XTQ-50
1
 
automatic temperature control dryer
QHQ-70
2
 
 steam double roller ironing machine
QPZQII3000
1
 
luxury energy-saving flat ironing table
QPZQQQ1500A
5
 
iron
(safety iron with push-button)
5
 
Presented
item
 quantity
item
quantity
                   trolley
4
copper medal
1
 clothing box
8
waistcoat
20
clothing barrel
5
chest card
20
clothes hanger
50
rubber footwear
8
panel
4
washtub
6
Project requirement
1.    site areaabove 400 square meter
2.    site requirements :  380v power
3      energy consumptionsteam consumption around 600 kg for each time
4.    Configuration of the boiler: More than 1 tons of boiler, the pressure reach 0.4-0.6Mpa.
5.    electricity demandabove 380V 60A electricity meter
6.    ironing speedabout 20-30m/min (400pcs bed sheet or 260pcs quilt cover for each hour)
7.    personnel allocation1218person
9.    Daily linen treatment capacity( 8 hours )about1800KG

Messages
Name: Communication email:
Content: